Link ot Connecticut Technical High School System main web site E.C. Goodwin Technical High School
735 Slater Road, New Britain, Connecticut 06053  Telephone: (860) 827-7736  Fax: (860) 827-7862

 

Carpentry and Drafting Departments Work Together to Construct Shed

At Goodwin Tech, shops work together on a regular basis. One recent example is the joint project between the Computer Aided Drafting and Design (CADD) department and the Carpentry department. Mike Cyr, Carpentry Department Head, said that he had a shed building project scheduled in early 2008. He asked the Computer Aided Drafting and Design program to help develop plans for the two sheds. CADD Department Head Joe Granja assigned two 11th grade students Jose Baez and Adrian Zygo to the project. Within a week, they developed the plans using CADkey and Key Creator 6.0. Another example of teamwork at Goodwin Tech.

The Carpentry Department then used the plans to construct the 10 foot by 14 foot shed with a 5 pitch hip roof that has architect roof shingles. They also made and installed the barn style shed doors. installed the soffit and bent the trim work for the fascia.  They used texture 111 for the exterior siding.

Carpentry and Drafting Departments Work Together to Construct Shed
Carpentry and Drafting Departments Work Together to Construct Shed
Carpentry and Drafting Departments Work Together to Construct Shed
Carpentry Students Work on Shed Project
Carpentry Students Work on Shed Project
Carpentry Students Work on Shed Project
Carpentry and Drafting Departments Work Together to Construct Shed
Carpentry Students Work on Shed Project