Kaynor Class of 2008 plumbers
began another off site production job in January, 2008. The residential
home located in Watertown is 3200 sq.ft. The students installed
and tested the rough piping for four full baths. They sized
and installed a propane gas main complete with a distribution manifold.
Also on this project they installed a multi zone radiant
heat system with 6 to 10 radiant pipe manifolds, boiler, and, (4) section
boiler. Both Juniors and Seniors spent time in on this large job
before preparing for the May NOCTI test.
|