(February,
2009)
Carpentry students completed their work on a construction project
in Montville. Last school year, they built a 2 car garage with
master bedroom above. It has a truss roof and stairs leading up
to the second floor from the garage area. The students framed
and shingled at the end of last school year and are currently
installing windows, shutters, vinyl siding and aluminum trim.
They also built an 8 foot x 32 foot
deck with a porch roof on the front of the house. |